
Electrical System | Section 6 |
|
|
Wiring Diagram Sequence of
OperationL1
QF400
Initial
1A. WATER FLUSH
Immediately after placing the toggle switch in “ICE”, the dump valve solenoid, and gearbox are energized. After 45 seconds the dump valve de- energizes.
GROUND |
|
|
|
|
|
| L2 (N) |
|
|
|
|
|
|
| |
(21) |
|
|
|
|
|
|
|
| RELAY |
|
|
|
|
|
|
| K2 |
|
|
|
|
|
|
|
| RELAY |
| HIGH | CONTACTOR |
| |
|
|
| PRESSURE |
| |||
|
| K1 | (90) | (95) | COIL | (65) | |
| 10 AMP |
|
|
|
| GEARMOTOR | |
(25) | FUSE |
|
|
|
| ||
|
|
| (46) |
|
|
| (43) |
|
| RELAY |
| (47) |
|
| (48) |
RELAY K4 |
|
|
|
| |||
K3 |
|
|
|
|
| ||
|
|
|
|
|
|
| |
WATER FLOAT |
|
|
| GEARMOTOR |
| ||
| VALVE COIL |
|
|
|
| ||
| (56) |
| RUN CAPACITOR |
| |||
(52) |
|
|
| ||||
|
|
|
|
|
|
(22)(55)
(51) | FAN MOTOR | |
|
(10)
DUMP VALVE
L1 T1
COIL
(41)(11)
CONTACTOR
CONTACTS
(14)
RUNSTART
(44)
SV3033
|
| 1A. Water Flush (45 Seconds) | |
|
|
| |
Toggle Switch |
| ICE | |
|
|
| |
Bin Level Probe |
| Open (No Ice Contact) | |
|
|
| |
Control Board Relays |
|
| |
|
|
|
|
#1 | Contactor Coil |
| Open / OFF |
|
|
|
|
| Compressor |
| OFF |
|
|
|
|
| Condenser Fan Motor |
| OFF |
|
|
|
|
#2 | Dump Valve |
| ON |
|
|
|
|
#3 | Gear Motor |
| ON |
|
|
|
|
#4 | Water Float Valve Solenoid Coil |
| OFF |
|
|
|
|
Revised 8/2003 | Part No. | |
|
|