Manitowoc Ice QF0800 Electrical System, Section, Wiring Diagram Sequence of OperationL1, QF400

Models: QF2200 QF0400 QC0700 QF0800 QF2300

1 150
Download 150 pages 297 b
Page 66
Image 66
Wiring Diagram Sequence of

Electrical System

Section 6

 

 

Wiring Diagram Sequence of

OperationL1

QF400

Initial Start-Up or Start-Up After Automatic Shut-Off

1A. WATER FLUSH

Immediately after placing the toggle switch in “ICE”, the dump valve solenoid, and gearbox are energized. After 45 seconds the dump valve de- energizes.

GROUND

 

 

 

 

 

 

L2 (N)

 

 

 

 

 

 

 

(21)

 

 

 

 

 

 

 

 

RELAY

 

 

 

 

 

 

 

K2

 

 

 

 

 

 

 

 

RELAY

 

HIGH

CONTACTOR

 

 

 

 

PRESSURE

 

 

 

K1

(90)

CUT-OUT

(95)

COIL

(65)

 

10 AMP

 

 

 

 

GEARMOTOR

(25)

FUSE

 

 

 

 

 

 

 

(46)

 

 

 

(43)

 

 

RELAY

 

(47)

 

 

(48)

RELAY K4

 

 

 

 

K3

 

 

 

 

 

 

 

 

 

 

 

 

WATER FLOAT

 

 

 

GEARMOTOR

 

 

VALVE COIL

 

 

 

 

 

(56)

 

RUN CAPACITOR

 

(52)

 

 

 

 

 

 

 

 

 

(22)(55)

(51)

FAN MOTOR

(AIR-COOLED ONLY)

 

(10)

DUMP VALVE

L1 T1

COIL

(41)(11)

CONTACTOR

CONTACTS

(14)

RUNSTART

(44)

SV3033

 

 

1A. Water Flush (45 Seconds)

 

 

 

Toggle Switch

 

ICE

 

 

 

Bin Level Probe

 

Open (No Ice Contact)

 

 

 

Control Board Relays

 

 

 

 

 

 

#1

Contactor Coil

 

Open / OFF

 

 

 

 

 

Compressor

 

OFF

 

 

 

 

 

Condenser Fan Motor

 

OFF

 

 

 

 

#2

Dump Valve

 

ON

 

 

 

 

#3

Gear Motor

 

ON

 

 

 

 

#4

Water Float Valve Solenoid Coil

 

OFF

 

 

 

 

6-4

Revised 8/2003

Part No. 80-1214-3

 

 

Page 66
Image 66
Manitowoc Ice QF0800, QF2300, QC0700, QF0400 Electrical System, Section, Wiring Diagram Sequence of OperationL1, QF400