NEC EXP320A, EXP320B, N8800-091F, N8800-090F manual Procedure in the Server Maintenance Utility

Models: N8800-091F EXP320B EXP320A N8800-090F

1 358
Download 358 pages 35.98 Kb
Page 240
Image 240

5-56 Installing and Using Utilities

Procedure in the Server Maintenance Utility

Perform the procedure below before replacement of a module.

1.Select the target module from the main window of the Server Maintenance Utility. The screen of the target module appears.

2.Check the current state of the target module with the LEDs.

3.Select [Clear] in [MTBF Clear] of the target module.

You can confirm the MTBF clear result by checking the LEDs of the target component. The result is registered in the syslog.

4.Start the component.

Sample screen of Server Maintenance Utility

Main window

[PCI Module] screen

Page 240
Image 240
NEC EXP320A, EXP320B, N8800-091F Procedure in the Server Maintenance Utility, Sample screen of Server Maintenance Utility