Project Information

4-17

Edit or New button

When the Edit or New button is clicked, Figure 4-18displays.

Figure 4-18Phased Installation - New or Edit Button

NOTE

Enter the appropriate information, as needed, in the Description and Notes fields.

After uploading the data, the corresponding phase will be marked as Date Committed. The check box can be cleared to resume the same phase data upload again.

Once a phase is uploaded, Installation Manager marks the phase as committed and enters the date that the phase was uploaded. Remember, this does not mean the phase data has been uploaded to the switch.

MA4000 Installation Manager User Guide - Revision 7

Page 91
Image 91
NEC MA4000 manual Edit or New button, 18Phased Installation New or Edit Button