Paradyne 1 BitStorm 1900 Installation Flowchart, BitStorm 1900 Installation and Testing

Models: 1900

1 160
Download 160 pages 57.32 Kb
Page 50
Image 50
2. BitStorm 1900 Installation and Testing

2. BitStorm 1900 Installation and Testing

Installation Flowchart

Figure 2-1, "BitStorm 1900 Installation Flowchart." provides a visual flowchart of the BitStorm 1900 installation process as a reference tool.

Figure 2-1: BitStorm 1900 Installation Flowchart

Start

Verify

Rack

Space,

Power and

Grounding

Install

Rack and Connect to Installation Flowchart

Building

Ground

Install

Power

Strip

AC Verify AC Power is

Available

Are you

 

 

 

 

 

 

 

Install

 

Installing an

 

 

 

 

 

MIU

 

 

 

 

 

 

 

AC or DC Power

 

 

 

 

 

Card

 

Card ?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Install Fan Tray

(leave 1RU of space

below for proper air flow).

Verify Power Card is

260W.

 

 

 

Install -48VDC

 

 

 

DC

Power Source

 

 

 

 

Are you

No

Install Air Baffle

Install appropriate

Verify Power and

using a Filter

cards into the

Connect to

 

On Top

Shelf ?

 

BitStorm 1900

BitStorm 1900

 

 

Install BitStorm 1900 Chassis directly on top of Fan Tray or 1 RU from bottom of rack

Install appropriate

Ethernet data connects to the MIU

Yes Figure 2-1: BitStorm 1900 Installation Flowchart

Install

Filter Shelf(s) on top of BitStorm

1900 Chassis

 

 

 

 

 

 

 

 

Install

 

 

 

 

 

 

 

 

 

 

Interconnecting

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

cables to the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BitStorm 1900

 

 

Are you

 

 

 

 

 

 

 

 

using a Filter

 

 

 

Shelf ?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Install Interconnecting

 

 

 

 

 

 

 

 

 

cables to the Filter

 

 

Yes

 

 

Shelf. Refer to

 

 

 

 

 

 

 

 

 

 

 

Appendix B for various

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

configurations

 

 

 

 

 

 

 

 

 

 

 

 

Install

Interconnecting

cable to the MDF

Install Interconnecting cable between the Filter Shelf and BitStorm 1900. Refer to Appendix B for various configurations

Turn Power

On

Configure the MIU

and Remote

Management

SNMP

Test System

End

02-17173

2-34

BitStorm 1900 Installation and Maintenance Guide

1900-A2-GN20-00

Page 50
Image 50
Paradyne 1 BitStorm 1900 Installation Flowchart, BitStorm 1900 Installation and Testing, 2-34, 1900-A2-GN20-00