
2. BitStorm 1900 Installation and Testing
Task 009: Installing Voice/Data w/Filter 66-Block Connections
Use this procedure to connect the BitStorm 1900 to the EtherLoop
Requirements
This procedure requires the following tools and materials:
•5 BitStorm 1900 cable harnesses
•5 intermediate cables
•
•
•Jumper Wire (24 AWG)
"Appendix B. Cabling Specifications," on page 115 contains the complete specifications for the cables and wiring required in this procedure.
Step Procedure
1.) Mount
2.) Verify the room position on frame blocks.
3.) Replace jumpers to
4.) Refer to Figure
BitStorm 1900 Installation and Maintenance Guide |
|