Paradyne 1900 manual continued, Step Procedure, Rxkdyhfrpsohwhgwklvwdvn, Stop

Models: 1900

1 160
Download 160 pages 57.32 Kb
Page 53
Image 53
(continued)

2. BitStorm 1900 Installation and Testing

Step Procedure

(continued)

 

 

5.) Verify all necessary BS 1900 system components, hardware, circuit packs, and cables are at the installation site and that they are in good condition. If a Materials List is provided, verify the packing list with it.

6.) Determine if an AC or DC power card is to be used in the configuration.

a.) If installing a DC power card, install the -48 V DC power source.

7.) Complete all remaining tasks in the order given unless otherwise directed.

STOP

<RX￿KDYH￿FRPSOHWHG￿WKLV￿WDVN￿

1900-A2-GN20-00

BitStorm 1900 Installation and Maintenance Guide

2-37

Page 53
Image 53
Paradyne 1900 manual continued, Step Procedure, Rxkdyhfrpsohwhgwklvwdvn, Stop