2. BitStorm 1900 Installation and Testing

Step Procedure

(continued)

 

 

9.) Secure the power harness in accordance with local office procedures.

10.) Turn ON the power to the shelf from the power supply.

STOP

<RX￿KDYH￿FRPSOHWHG￿WKLV￿WDVN￿

1900-A2-GN20-00

BitStorm 1900 Installation and Maintenance Guide

2-53

Page 69
Image 69
Paradyne 1900 manual Rxkdyhfrpsohwhgwklvwdvn