
2. BitStorm 1900 Installation and Testing
Step Procedure | (continued) |
|
|
9.) Secure the power harness in accordance with local office procedures.
10.) Turn ON the power to the shelf from the power supply.
STOP
<RXKDYHFRPSOHWHGWKLVWDVN
BitStorm 1900 Installation and Maintenance Guide |