4.) Connect one Amp-Champ connector of an intermediate cable to the "Line/CPE" side of the EtherLoop cross-connect block, then connect the other end to an Amp-Champ to Dual Omni Grid cable.

2. BitStorm 1900 Installation and Testing

Step Procedure

(continued)

 

 

4.) Connect one Amp-Champ connector of an intermediate cable to the "Line/CPE" side of the EtherLoop cross-connect block, then connect the other end to an Amp-Champ to Dual Omni Grid cable.

5.) Connect the Amp-Champ connector of the second intermediate cable to the "Voice" side of the EtherLoop cross-connect block, then connect the other end to an Amp-Champ to Dual Omni Grid cable.

6.) Connect the two Omni-Grid connectors from the EtherLoop "Line/ CPE" side to the "Dial Tone & EtherLoop OUT" ports of the filter shelf as shown in Figure 2-12, "Line/CPE and Voice Connections on the Filter Shelf for 10306 Modem Cards," on page 61.

7.) Connect the two Omni-Grid connectors from the "Voice" side to the "Dial Tone IN from PBX/PSTN" ports of the filter shelf as shown in Figure 2-12, "Line/CPE and Voice Connections on the Filter Shelf for 10306 Modem Cards," on page 61, and Figure 2-13, "Line/CPE and Voice Connections on the Filter Shelf for 10224 Modem Cards," on page 62. Record EtherLoop assignments.