SOLA 4000 - Installation and Initial Start-Up
1 Installation
1.7 Diesel - Generator Operation
During diesel generator operation, if the frequency of the diesel- generator, with UPS and load connected, is unstable, it is advisable to disconnect the synchronisation of the inverter. This is achieved with a
FIG. 1.7.1 Connection for Diesel Generator Operation (connector M4) - synchronisa- tion disable.
Note1: For
If it is necessary to reduce the current supplied by the diesel- generator, then a second
FIG. 1.7.2 Connection for Diesel Generator Operation (connector M8) - second level current limitation.
Note 1: The cable used in both cases must be twisted pair, with a total shield.This shield must be grounded at one end (the cabinet of theUPS may be used).
Note 2: The cable for current limitation must be connected to all units for parallel or
JUE 401265 | 33 |