INSTALLATION

SECTION 3-1

OVERVIEW

This section deals with the procedures required to place your BP 2400 Series Granulator into service after you receive it at your plant. The following basic steps need to be accomplished.

Uncrating the machine

Accounting for all necessary parts

Inspecting for damage and reporting any damage to the carrier

Cleaning the protective coating from the machine

Moving the machine to its service location

Checking and, if necessary, adjusting mechanical parts before applying electrical power

Connecting electrical power to the machine control panel and hydraulic cylinder/jackscrew control panel located on the machine

Performing the start-up procedure

PLEASE FOLLOW THESE STEPS, AS OUTLINED TO ACHIEVE A SAFE AND SUCCESSFUL START- UP OF YOUR GP-SERIES GRANULATOR.

The machine weights for the BP-Series Granulators are as follows: BP 2428-10000 pounds BP 2439-13000 pounds BP 2456-16000 pounds

UNCRATE THE GRANULATOR

As shipped, the granulator and the hopper are securely bolted onto separate skids and covered with a wooden crate. The electrical cabinet, an optional item, is similarly packaged when ordered.

Remove the strapping.

Remove the packages and parts from the skid or inner sides of the crate. Remove the hold-

down bolts, nuts, etc.

Inspect for damage during transit and notify the carrier immediately of any damage.

Check the packing list and notify Sterling if there are any shortages.