2 Troubleshooting Procedures

Procedure 2 Diagnostic Test Program Execution Check

Execute the following tests from the Diagnostic Test Menu. These tests check the system board. Refer to Chapter 3, Tests and Diagnostic, for more information on how to perform these tests.

1.System test

2.Memory test

3.Keyboard test

4.Display test

5.Floppy Disk test

6.VGA test

7.VGA Memory test

8.Hard Disk test

9.CPU Temperature test

10.Main Battery test

11.BIOS test

12.CD-ROM/DVD-ROM test

13.System Status LED test

14.Wireless LAN test

15.LAN/Modem/Sound test

16.UUID test-DMI Information (Write DMI)

If an error is detected during these tests, go to Procedure 3.

Procedure 3 Replacement Check

System board may be faulty. Disassemble the computer following the steps described in Chapter 4, Replacement Procedures and replace system board with a new one.

Qosmio X500 Maintenance Manual (960-Q08)

 

14

Page 58
Image 58
Toshiba X500 manual Procedure 2 Diagnostic Test Program Execution Check, Procedure 3 Replacement Check