Prestige 480 Dual BRI ISDN Router

Chapter 2

Hardware Installation & Initial Setup

This chapter shows you how to make the cable connections to your Prestige as well as set up your ISDN connection using the SMT.

2.1Front Panel LEDs

The LED indicators on the front panel indicate the router functional status of the Prestige. The following table describes the LED functions:

 

 

Figure 2-1 Front Panel

 

 

Table 2-1 LED Functions

 

 

 

Field

 

Description

PWR

 

The PWR (power) LED is on when power is applied to the Prestige.

SYS

 

The SYS (System) LED is on when the system is running normally, and off when the

 

 

system is not ready or failed. It flashes when the system is rebooting.

LAN

10M

This green LED is on when the 10M Ethernet is connected and ready and off when

 

 

the 10M Ethernet is not ready or failed. This LED flashes when the Prestige is

 

 

sending or receiving packets.

100M

 

This orange LED is on when the 100M Ethernet is connected and ready and off

 

 

when the 100M Ethernet is not ready or failed. This LED flashes when the Prestige

 

 

is sending or receiving packets.

Hardware Installation and Setup

2-1

Page 41
Image 41
ZyXEL Communications 480 Chapter Hardware Installation & Initial Setup, Front Panel LEDs, LED Functions, Field Description