Ingersoll-Rand 100-200 HP/75-160 KW AIR Compressor Group Bonded Warranty & Registered Start UP

Page 2

AIR COMPRESSOR GROUP

BONDED WARRANTY & REGISTERED START UP

Warranty

The Company warrants that the equipment manufactured by it and delivered hereunder will be free of defects in material and workmanship for a period of twelve months (see extended airend warranty) from the date of placing the Equipment in operation or eighteen months (see extended airend warranty) from the date of shipment from Davidson, NC, whichever shall first occur. The Purchaser shall be obligated to promptly report any failure to conform to this warranty, in writing to the Company in said period, whereupon the Company shall, at its option, correct such nonconformity, by suitable repair to such equipment or, furnish a replacement part F.O.B. point of shipment, provided the Purchaser has stored, installed maintained and operated such Equipment in accordance with good industry practices and has complied with specific recommendations of the Company. Accessories or equipment furnished by the Company, but manufactured by others, shall carry whatever warranty the manufacturers have conveyed to the Company and which can be passed on to the Purchaser. The Company shall not be liable for any repairs, replacements, or adjustments to the Equipment or any costs of labor performed by the Purchaser or others without Company’s prior written approval.

The effects of corrosion, erosion and normal wear and tear are specifically excluded. Performance warranties are limited to those specifically stated within the Company’s proposal. Unless responsibility for meeting such performance warranties are limited to specified tests, the Company’s obligation shall be to correct in the manner and for the period of time provided above.

THE COMPANY MAKES NO OTHER WARRANTY OR REPRESENTATION OF ANY KIND WHATSOEVER, EXPRESSED OR IMPLIED, EXCEPT THAT OF TITLE, AND ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, ARE HEREBY DISCLAIMED.

Correction by the Company of nonconformities whether patent or latent, in the manner and for the period of time provided above, shall constitute fulfillment of all liabilities of the Company for such nonconformities whether based on contract, warranty negligence, indemnity, strict liability or otherwise with respect to or arising out of such Equipment.

The purchaser shall not operate Equipment which is considered to be defective, without first notifying the Company in writing of its intention to do so. Any such Equipment will be at Purchaser’s sole risk and liability.

Note that this is Ingersoll-Rand’s standard warranty. Any warranty in force at the time of purchase of the compressor or negotiated as part of the purchase order may take precendence over this warranty.

©INGERSOLL-RAND COMPANY

Image 2
Contents Phone CCN 80440415 REV B Form Apdd 738BAIR Compressor Group Bonded Warranty & Registered Start UP Rotary Screw AIR Compressor This unit was purchased fromTable of Contents Safety and Warnings Safety Shutdown Lift Here DecalsDecals Viewed From RearCompressor Package Data Unpacking and Handling InspectionIngersoll-Rand Company Davidson, North Carolina ToolsNever elevate the compressor unit VentilationFoundation Requirements Performance will be affectedDo not use the compressor to support the discharge pipe Moisture Content of Compressed AIRPiping Discharge Piping with Aftercooler ROTARY-RECIP in ParallelElectrical Installation Rotary TWO Compressor SystemRotation Check Drive MotorFAN Motor Electrical InstallationHasp Lever TAG KEY Lock Intellisys Operating InstructionsOutdoor Sheltered Installation 1 Typical Outdoor Sheltered Installation Intellisys Intellisys ControllerStart Power on LightIntellisys Controls Emergency Stop StopCurrent Status Items Display ScreenCurrent Status Panel Flow Figure DiagramOperator IntellisysMain Menu Operator SetpointsOptions Options Items Range Step UnitOptions Sensor Calibration Items Alarm HistorySensor Calibration Alarm History Items Clock FunctionsIntegral Sequencing Integral Sequencing Range Step UnitStatus Main Menu Reset Alarms Alarm Main MenuPage Maintenance Procedures Maintenance ScheduleMaintenance Records Number of Running HOURS, Whichever Occurs First200 HP/132-160 KW Requires 2 Elements Inlet AIR FilterCoolant Filter ElementsCoolant Drain CoolantItems Required Hot coolant can cause severe injurySeparator Tank Scavenge SCREEN/ORIFICE Tools Required ProcedureCoolant Recommended Bolt Tightening Cross Pattern Coolant Separator ElementTank cover bolt torque values 125/200 HPCooler Cores Cleaning Coolant CoolersAftercooler Aftercooler CleaningAftercooler Motor Lubrication Relubrication amount Lubricant Amount Motor Frame Size GramsRecommended Motor Grease Motor Bearing Maintenance Stored UnitsMotor Lubrication Hazardous voltage. Can cause severe injury or deathTools Long Term Storage GeneralIntellisys Removal Controller RemovalCoolant Hoses InstallationCoolant Sampling Procedure RemovalCoolant Cooler AIR Cooled Compressors Design TemperaturesGeneral System Information Cooling FAN MotorOperation Compressed AIR System The air system is composedCOOLANT/AIR Separation System Electrical SystemCapacity Control STAR-DELTA Type StarterStepper Motor Inlet Control Automatic Unloaded StartFirst Modulation onlyAutomatic START/STOP Control Example SecondSome Examples of Operation Remote START/STOP Troubleshooting Chart Troubleshooting Chart LOW Ambient Power Outage Restart OptionSequencer Separator DELTA-P SolenoidRemote LOAD/UNLOAD ModbusElectrical Schematic Star Delta Reference DrawingsPage Foundation Plan 125-150 HP/90-110KW Aircooled Single Stage Foundation Plan 125-150 HP/90-110 KW Aircooled Single Stage Foundation Plan 200 HP/132-160 KW Aircooled Single Stage Foundation Plan 200 HP/132-160 KW Aircooled Single Stage REV C REV C Foundation Plan 200 HP/132-160 KW Watercooled Single Stage Foundation Plan 200 HP/132-160 KW Watercooled Single Stage Foundation Plan Aircooled 100-150 HP/75-110 KW TWO StageFoundation Plan Aircooled 100-150 HP/75-110 KW TWO Stage Foundation Plan Aircooled 200 HP/132-160 KW TWO Stage Foundation Plan Aircooled 200 HP/132-160 KW TWO Stage Foundation Plan -WATERCOOLED Foundation Plan -WATERCOOLED 100-150 HP/75-110 KW TWO Stage Foundation Plan -WATERCOOLED 200 HP/132-160 KW TWO Stage Foundation Plan -WATERCOOLED 200 HP/132-160 KW TWO Stage Flow Schematic Aircooled Single Stage Page Flow Schematic Watercooled 90F 32C Single Stage Page Flow Schematic Watercooled 115F 46 Single Stage Page Flow Schematic AIR-COOLED TWO Stage Page Flow Schematic Watercooled 90F 32C TWO Stage Page Flow Schematic Watercooled 115F 46C TWO Stage Page Typical System Flow Diagram Typical System Flow DiagramsTypical System Flow Diagrams Typical System Flow Diagrams Typical System Flow Diagrams Typical System Flow Diagrams Fouling ScaleCorrosion Parameter Concentration Frequency of AnalysisPage Hardness ppm Temperature FTotal dissolved solids ppm Alkalinity ppmMaintenance Record Maintenance Record Maintenance Record Maintenance Record