A-BOOM PRE-DELIVERY INSPECTION CHECKLIST

Pre-Operation Inspection: Check the following items before operating the unit to assure that they are properly assembled. (See following page 1-4 for component location)

Flail Mower Head:

___ Skid Shoe Bolts are torqued to 120 ft-lbs (Item 15 page 5)

___ Motor Bolts are torqued to 120 ft-lbs

___ Belt Alignment& tension adjustment is correct

___ Cutter shaft bearings are properly lubricated

___ Roller bearings are properly lubricated (Item 16 Page 5)

___ Blades swing freely

Tractor Mower Operation Inspection:

___ Using all Safety precautions, operate the Tractor and Mower unit for 30 minutes and while the unit is running check the following items: Note! Only make adjustments after the mower has been turned off and all motion has stopped and all hydraulic pressure has been relieved.

___ No Hydraulic oil leaks at the hose connections

___ Operate the boom and mower head throughout its full range of motion and check for hose's rubbing, pinching, or kinking.

___ Make sure the Return Filter Gauge is reading in the Green after Oil is warm.

___ Check the function of the Mower Head On-Off Valve and switch for proper function

___ Make sure that the tractor will not start with the mower on-off switch in the on position.

___ Check the Blade Rotation for the Rotary Mower Head to make sure it is turning Clockwise looking from the top of the mower deck.

___ Make sure the control valve boom movements agree with the valve operation decal.

___ Make Sure Boom Movement operates as expected and is smooth and under control (no air in the control system)

___ Look for any unusual or excessive noise or vibrations.

___ Make sure all Wheel Weights are installed, Tires are Filled with liquid and Counter Weight is installed

___ Make sure the left rear wheel of the tractor stays on the ground when the boom is fully extended horizontally with 200 lbs. placed on the outside of the mower head.

Post-Operation Inspection:

___ Check that the oil in the hydraulic tank has not turned milky in color or has foam on top.

___ Check that there are no loose fasteners or hardware.

A-Boom (JD 6615/ 7615 Asy Instruction Manual) 07/03

 

© 2003 Alamo Group Inc.

Section 1 -

4

Image 16
Contents Boom John Deere 6615To the OWNER/OPERATOR/DEALER Introduction Index Assembly Instruction Safety Section Operation SafetyFilling Hydraulic Tank w/Oil 11-2 to Index Safety Section Safety 2003Alamo Group Inc SG-23 Death Components contain or emit chemicals known to the state Boom Assembly Tools, Supplies and Equipment Needed Paint Scraper to remove Paint before welding. RecommendedSaftey Equipment Frame and BoomHydraulic System Rotary Mower HeadTractor Mower Operation Inspection Flail Mower HeadPost-Operation Inspection Tractor Mower Component Location Wheel Weight Installation Fill Left Rear Wheel with Liquid Rear Wheel Counter WeightQty Description Installing Wheel Weight Alamo Group Inc Front Pump Drive Shaft Installation BoomInstalling Pump, Pump Drive Components and Hydraulic Tank Pump / Drive Assembly InstructionsInstalling Pump Drive Components Drive Shaft Assembly Installing Pump Mount Plate & Tube End of Driveshaft Plate # 02976087 standard mount plate SeeInstalling Pump See Figure Install Front frame Rail Supports Alamo Group Inc Frame Rail / High Frame Setup / Pre- Assembly Installation Frame Rail Set Up Frame Rail Pre-AssemblyFrame Rail Installation Frame Stiiffener Kit High Frame Mounting Tube Componnets High Frame Installation High Frame & King Post Asy Pre-Installing Frame Rails Front Frame Rail Mount Pad Support Mount Floor Jack Frame Rail Installation Pre-Installing High Frame 24-1/2 Min Height frame to Hood High Frame Frame Rail Section Pre-Install Mounting Tubes for High Frame Item Part NoLine with Tack Welding Frame Rails Mounted the hole will be up. See Item Frame To the mounting Tube. See Figure Recheck that all components areRemove High Frame for Final Welding Remove High Frame for Welding Frame Rail Installation Alamo Group Inc Frame Rail & High Frame Final Installation Re-Install Frame Rails to Tractor Boom Rest Frame Rail Installation 4 WD See . Check that all Bolts and Nuts Are installedRe-Install High Frame to Tractor See Tighten LH & RH Side Frame Rail Hyd. Tank, CWT & Decal Final Installation Hydraulic Tank Installation Hyd. Tank CWT InstallationCounter Weight Installation Decal Installation Tank Decal InstallationTank Oil Level Sight Gauge Decal Part Number. See , 33OFF Switch See Figure Cab Decal InstallationSide Window. See Figure Boom Installation Boom Installation / Boom Hoses Boom InstallationCutter Motor Control Valve Asy Attach Swing Hose Installation Pump / Tank Hose InstallationReturn Hose Pressure Gauge Alamo Group Inc Cylinder Control Valve Installation StandardControl Handle Assembly Installation Cylinder Control Valve InstallationController assemblies will be bolted On OFF Switch Installation Common Problems Standard Control Valve OperationSpool Valve Shown System Schematic Cylinder Hydraulic Control Circuit See Figures 2Cylinder Hydraulic Control Circuit See Cylinder Hydraulic Control Circuit Mechanical Valve ModelsCylinder Control Valve Installation Remote Cable Operation and Installation Control Assembly Controller End Installation Procedure Tractor FrontAlamo Group Inc Optional Joystick Wire Harness & Valve Installation Optional Joystick Mounting Cushion Removed Three Existing HolesInstalling Joystick Mount to Trac- tor Seat Option Joystick MountingInstalling Wiring Harness for Joystick InstallingJoystick to BracketJoystick Mounting 2 WD & 4 WD Wire Harness Through Cab. There is a Installing Wiring Harness to Joystick Align the Plug GuidesInstalling Warning Instruction Decals 02967827 02965262Wire Harness / Valve Mounting 2 WD & 4 WD Installing Wire Harness To ValveInstalling Wire Harness To ValveBOOM, Disregard this Section Joystick w/ Push/Pull Motor Switch & Rocker Master Switch Joystick Plug Bottom of Joystick ConsoleWire Harness Joystick Console Plug to Valve Control Valve Electric / Hydraulic Control Valves See FigureAlamo Group Inc Head Installation Optional Heads Optional Mower Head Installation Attaching Flail-Axe HeadAttaching Flail Head Attaching Ditcher Head Alamo Group Inc Frame Square Head Attachment Fill Hydraulic Tank Fill Hydraulic Tank Fill Hydraulic Tank with OilFill Hydraulic Tank Alamo Group Inc Hydraulic Start-Up Procedures Start-up Instructions Post-Assembly Check List Alamo Group Inc Boom Rest Plate Boom Swing Stop Installation Boom Rest Plate & Hook Installation Boom Rest Plate installationBoom Marked Here HereBolt on Boom Rest Hook Clamp Boom Swing Stop installation Boom Swing Stop InstallationTack Weld Boom Swing Stop Lug. Tack Alamo Group Inc Alamo Group Inc Page Boom JD 6615 & JD7615 Assembly Manual Edition