Frame Rail Installation
Remove High Frame for Final Welding.:
1.Remove and Weld High Frame. Lift the High frame back up off of frame rails (See Figure 46). Finish Weld Mount Tubes. The Mounting Tubes are to be welded completely all the way around. This is why it is best to take High frame off, so that the Weld can done as strong as possible and in places that you can’t get to with High frame mounted on Frame rails. This is also recommended so Assemblies can be turned while welding to get maximum quality welds.
2.Welding Mounting Tubes all the way around. The Mounting Tubes must be welded to the High Frame all the way around, Turn High frame as required to weld all the way around (See Figure 49 & 50). These must be strong Welds.
Left Side of High
Frame &
Mounting Tube
Weld Solid all
the way around
Figure 47
Turning High frame to weld all the way
around Mounting Tubes.
Figure 49
Figure 46
Right Side of High
Frame &
Mounting Tube
| Weld Solid all |
Figure 48 | the way around |
| |
|
|
Turning High frame to weld all the way
around Mounting Tubes.
Figure 50
© 2003 | Alamo Group Inc. | Section 4 - 21 |
|