6.The Side Rails. These Frame rails will be welded to the Rail Support Plates, so it will be necessary to scrape the paint off approxi- mately 5/8" of the base before attaching. Clamp Side Rails to Front Mount Supports. (See Figure 55).
NOTE: There is a Tire Limit, This should be addressed when ordering the Mount Kit designed to fit with the specified Tire Size. If larger than Tires specified for Mount Kit are installed, mount- ing kit may not fit.
7.The Pig Tail Brackets will be welded to the underside of the Rails, so it will be necessary to scrape the paint off from this area before attaching and welding them (See Figure 57). These Pigtails are to hold the Hoses up. Be sure to run the hoses for the Boom through these Pigtail rings.
NOTE: All parts are painted. When welding is required, scrape away the paint in the area to be welded to help assure the integrity of the weld. Repaint /
Figure 55
1/4"
Figure 56
Figure 57
Pigtail Bracket
Weld here on | Do not weld |
both sides. | Across the Tube. |
3 |
|
Figure 58 | Not Shown in |
Actual Location |
© 2003 | Alamo Group Inc. | Section 4 - 23 |
|