Boom Swing Stop Installation

Boom Swing Stop installation:

1.

Position Boom Swing Stop Lug. BoomSwing

Stop Log is used to prevent Boom from swinging back

to far and hitting Cab. With Boom folded and restin on

Boom Hook in Boom Rest Plate. Position the

BoomSwing Stop on King Post Mount behond the Lift

Cylinder Lug. (See Figure 10) This can be difficult to

hold heare while you tack it, it is important that it be

square and touch the Cylinder lug as shown. (See

Figure 10).

2.

Tack Weld Boom Swing Stop Lug. Tack

Weld the Boom Swing Stop Lug to the King Post

Mount (DO Not Weld to the King Post). (See Figure 11)

Tack Wled the Lug secure enough that the Boom can

be swung out to the side, this gives you more rome to

weld on the Boom Swing Stop Lug completly(See

Figure 12)

3.

Weld Boom Swing Stop Lug Solid. After the

Boom is swung out 90 deg. from tractor completly

Boom Swing

Stop Lug

High Frame

FIGURE 10

King Post Lift

Cyl Lug

weld the Stop Lug to the King Post Mount on High

frame (See Figure 12). Slowly swing th Boom inward

to the Boom rest and make sure tha Boom cannot be

swung in so far that it will hit the cab of tractor. This is

a very critical step and must be done with extreme

caution so as not to damage Cab of tractor.

Tack Weld

Boom

Swing Stop

FIGURE 11

FIGURE 12

FIGURE 13

A-Boom (JD 6615 / 7615 Asy Instruction Manual) 07/03

© 2003 Alamo Group Inc.

Section 13 - 4

Image 115
Contents John Deere 6615 BoomTo the OWNER/OPERATOR/DEALER Introduction Safety Section Operation Safety Index Assembly InstructionFilling Hydraulic Tank w/Oil 11-2 to Index Safety Section Safety 2003Alamo Group Inc SG-23 Death Components contain or emit chemicals known to the state Boom Paint Scraper to remove Paint before welding. Recommended Assembly Tools, Supplies and Equipment NeededRotary Mower Head Saftey EquipmentFrame and Boom Hydraulic SystemTractor Mower Operation Inspection Flail Mower HeadPost-Operation Inspection Tractor Mower Component Location Wheel Weight Installation Fill Left Rear Wheel with Liquid Rear Wheel Counter WeightQty Description Installing Wheel Weight Alamo Group Inc Boom Front Pump Drive Shaft InstallationInstalling Pump, Pump Drive Components and Hydraulic Tank Pump / Drive Assembly InstructionsInstalling Pump Drive Components Drive Shaft Assembly Plate # 02976087 standard mount plate See Installing Pump Mount Plate & Tube End of DriveshaftInstalling Pump See Figure Install Front frame Rail Supports Alamo Group Inc Frame Rail / High Frame Setup / Pre- Assembly Installation Frame Rail Pre-Assembly Frame Rail Set UpFrame Rail Installation Frame Stiiffener Kit High Frame Mounting Tube Componnets High Frame Installation High Frame & King Post Asy Pre-Installing Frame Rails Front Frame Rail Mount Pad Support Mount Floor Jack Frame Rail Installation Pre-Installing High Frame 24-1/2 Min Height frame to Hood High Frame Frame Rail Section Item Part No Pre-Install Mounting Tubes for High FrameLine with Tack Welding Frame Rails Mounted the hole will be up. See Item Frame Recheck that all components are To the mounting Tube. See FigureRemove High Frame for Final Welding Remove High Frame for Welding Frame Rail Installation Alamo Group Inc Frame Rail & High Frame Final Installation Re-Install Frame Rails to Tractor Boom Rest See . Check that all Bolts and Nuts Are installed Frame Rail Installation 4 WDRe-Install High Frame to Tractor See Tighten LH & RH Side Frame Rail Hyd. Tank, CWT & Decal Final Installation Hydraulic Tank Installation Hyd. Tank CWT InstallationCounter Weight Installation Decal Part Number. See , 33 Decal InstallationTank Decal Installation Tank Oil Level Sight GaugeOFF Switch See Figure Cab Decal InstallationSide Window. See Figure Boom Installation Boom Installation / Boom Hoses Boom InstallationCutter Motor Control Valve Asy Attach Swing Pump / Tank Hose Installation Hose InstallationReturn Hose Pressure Gauge Alamo Group Inc Standard Cylinder Control Valve InstallationControl Handle Assembly Installation Cylinder Control Valve InstallationController assemblies will be bolted On OFF Switch Installation Standard Control Valve Operation Common ProblemsSpool Valve Shown Cylinder Hydraulic Control Circuit See Figures 2 System SchematicCylinder Hydraulic Control Circuit See Mechanical Valve Models Cylinder Hydraulic Control CircuitCylinder Control Valve Installation Remote Cable Operation and Installation Tractor Front Control Assembly Controller End Installation ProcedureAlamo Group Inc Optional Joystick Wire Harness & Valve Installation Cushion Removed Three Existing Holes Optional Joystick MountingOption Joystick Mounting Installing Joystick Mount to Trac- tor SeatInstalling Wiring Harness for Joystick InstallingJoystick to BracketJoystick Mounting 2 WD & 4 WD Wire Harness Through Cab. There is a Align the Plug Guides Installing Wiring Harness to Joystick02967827 02965262 Installing Warning Instruction DecalsInstalling Wire Harness To Valve Wire Harness / Valve Mounting 2 WD & 4 WDTo Valve Installing Wire HarnessBOOM, Disregard this Section Joystick Plug Bottom of Joystick Console Joystick w/ Push/Pull Motor Switch & Rocker Master SwitchWire Harness Joystick Console Plug to Valve Control Valves See Figure Control Valve Electric / HydraulicAlamo Group Inc Head Installation Optional Heads Attaching Flail-Axe Head Optional Mower Head InstallationAttaching Flail Head Attaching Ditcher Head Alamo Group Inc Frame Square Head Attachment Fill Hydraulic Tank Fill Hydraulic Tank with Oil Fill Hydraulic TankFill Hydraulic Tank Alamo Group Inc Hydraulic Start-Up Procedures Start-up Instructions Post-Assembly Check List Alamo Group Inc Boom Rest Plate Boom Swing Stop Installation Boom Rest Plate installation Boom Rest Plate & Hook InstallationBoom Marked Here HereBolt on Boom Rest Hook Clamp Boom Swing Stop installation Boom Swing Stop InstallationTack Weld Boom Swing Stop Lug. Tack Alamo Group Inc Alamo Group Inc Page Boom JD 6615 & JD7615 Assembly Manual Edition