Frame Rail Installation 4 WD
Re-Install Frame Rails to Tractor: (continued)
6. Install Stabilizer Crossmember. This will con- |
| |
sist of a Tube cross member and four Bolts and | RH Axle Strap | |
Nuts (See Figure 11). Install the Bolts with the | ||
| ||
Nuts on Top and bolts coming in from the Bottom |
| |
(See Figure 12), this way only the Head of the Bolt |
| |
is lower than the Crossmember. Snug the Bolts; do |
| |
not tighten them yet. |
|
7.Weld Stabilizer Gusset to Rail Stiffener Weldment. Weld the Gusset to the Stabilizer Weldment now, Weld on both sides of the Gusset. The LH Gusset and RH Gusset must be welded.
(See Figure 13). Check that all Bolts and Nuts | Figure 9 |
are installed. |
Boom Rest |
|
| Axle Strap Bolts |
Figure 10 | Figure 11 |
Install with Nuts on top and Bolt Heads on the bottom
Figure 12
Stabilizer |
|
Gusset |
|
| Weld Gusset to |
| Stabilizer on both |
Figure 13 | sides. |
|