Frame Rail Installation
Tack Welding Frame Rails: (continued)
6.Tack Weld Front and Rear Angle Mounts. The Angle Mounts should be tack
Welded to the Frame Rails in 4 places each. | Tack Weld in 4 |
This works best by weld a tack Weld in each | Corners of Angle |
corner of Angle Mount. (See Figure 40 & | Mounts |
41). All 4 of the Angle Mounts must be Tack |
|
Welded to frame rail now. |
|
7.Tack Weld Mounting Tubes to High Frame. The Mounting tubes will be Tack Welded to the High Frame in 3 places on top and 3 places on the bottom, on both LH & RH Side (See Figure 42 & 43). These Tack Welds need to be done in an alternating
pattern so Mounting Tubes do not Lift or
move. There should not be any gaps be- Figure 40 tween Frame Rails, High Frame or Mounting
Tubes. Do this on LH and RH Frames.
| Tack Weld Mounting Tube Here |
Mounting Angle | in 6 places 3 top & 3 bottom |
w/ Bolts & Nuts | Machete High Frame |
Tack Weld Here | Mounting Tube |
| |
to Frame Rail |
|
|
| Approx 1/2 | |
|
| from end | |
Front | Bar Mounting Straps | Set High | |
Support | |||
with Bolts & Nuts | Frame in | ||
Mount | |||
| Line with | ||
|
| ||
|
| Frame Rail | |
|
| Machete High Frame | |
Figure 41 | Frame | ||
Rail | |||
|
|