Frame Rail Installation
Re-Install Frame Rails to Tractor: (continued)
5.Install Axle Mounted Boom Rest. This will require two people, one to align the Boom rest with the Hoist and one to align the Bolt holes on the bottom to start them into the Axle Housing. (See
Figure 5, 6 & 7)
When the Bolts are installed into the Frame Rail & Boom Rest Plates and snugged up to Axle housing, install the RH Axle Mounting Strap (See Figure 8, 9 & 10). Do not tighten Bolts snug them only for now.
Figure 5
Boom Rest
Plate
Boom Rest
Right |
|
| |
Rear | Cab | ||
Wheel | Side | ||
Side | of | ||
of | Boom | ||
Boom | Rest |
| |
Figure 6 | |||
Rest |
|
RH Axle Strap
Boom Rest
WeldmentBack
Front
Figure 7
Figure 8
© 2003 Alamo Group Inc. | Section 5- 3 |