Operation
Verification Operation Verification is a subset of the Performance Verification tests that
follow. For the AFG, Operation Verific a tion consists of the following tests:
DC Accuracy
AC Accuracy
Total Harmonic Distortion
Performance
Verification The procedures in this secti on are used to test the AFG’s electrical
performance using the specifications in Appendix A of the Agilent E1445A
User’s Manual as the performance standards. These te sts are suitable for
incoming inspection, troubleshootin g, and prev e ntive maintenance. The
results of the Performance Verification te sts should be recorded in the
Performance Test Record (Table 2-11).
Performance Verification includes the following tests:
Test # Test Name
2-1
2-2
2-3
2-4
2-5
2-6
2-7
2-8
2-9
2-10
DC Zeros
DC Accuracy
DC Offset
AC Accuracy
AC Flatness - 250 kHz filter
AC Flatness - 10 MHz filter
Frequency Accuracy
Duty Cycle
Total Harmonic Distortion
Spurious/Non-harmonic Distortion

32 Verification Te sts Agilent E1445A Serv ice Manual