Arizona MAX-5000XL user manual  Test Start - begins to send data at the start of the test

Models: MAX-5000XL

1 92
Download 92 pages 19.89 Kb
Page 18
Image 18
Test Start – begins to send data at the start of the test,

Move the selection box down to REPORT START and press [ENT]. Select between:

Test Start – begins to send data at the start of the test,

First Prediction - begins to send data as soon as the instrument makes the first prediction, or

Test End – waits to send data until after the test is over and then sends only the final results of the test.

Press [ENT] to select your choice.

Move the selection box down to REPORT INTERVAL and press [ENT]. Select an interval that will provide the test progress report you need and press [ENT] again to select your choice.

Move the selection box down to INCLUDE GRAPH. Pressing [ENT] will toggle between YES and NO.

Select NO if you do not need a printed graph of the test.

Select YES if you have only

the parallel port selected and want to print the graphic plot of weight and moisture/ash results for a test.

Press [ESC] to return to the REPORT SETUP MENU.

Select REPORT ITEMS TO PRINT. See page 52.

By default, all items are selected to print. If you do not want or need items, use the arrow keys to select the item(s) and press [ENT] to toggle the check mark off. If you later need the item, position the cursor in front of the item and press [ENT] to toggle the check mark back on.

Press [PAGE 2] to see additional selections.

Press [ESC] until the Main Test Screen appears.

The output to the printer will be tested when a weight test is performed later. If you are connecting a printer to an instrument that has been in operation, it is necessary to

1.Turn the MAX 5000XL OFF

2.Connect the printer to the MAX 5000XL.

3.Power ON the printer,

4.Turn the MAX 5000XL back ON to establish the communications.

5.Run a weight test and monitor the output to the printer.

AZI Customer Service 800-528-7411 or 602-470-1414

Page 18 of 92

Page 18
Image 18
Arizona MAX-5000XL user manual  Test Start - begins to send data at the start of the test