4.1. Interior of Test Chamber
∙Remove the sample pan support from its separate box and packing foam.
∙Save the box and foam so that the support can be packaged when the instrument is returned to the factory for annual calibration.
NOTE: Shipment of the instrument with the pan support in place will damage the ceramic oven and the balance. Damage caused by improper shipment is not covered by the warranty.
∙Open the lid of the MAX 5000XL by lifting the handle just above the display.
∙Install the pan support gently but firmly into the instrument. The stem of the pan support fits snugly into the balance.
∙Check the clearance between the pan support arms and the heat shield by observing the space between the arms and the heat shield. The clearance should be between 1.5mm to
4.75mm, [1/16” to 3/16”] and equal for all five arms of the pan support. If the clearance is considerably different for one arm or the pan support appears to be crooked, call AZI Customer Service at
CAUTION - Avoid excess pressure from the top or sides of the pan support that can damage the force balance. Only install or remove the pan support when the instrument is powered OFF.
AZI Customer Service | Page 13 of 92 |