Carrier Initial Start-Up Checklist, FOR 19XR, XRV HERMETIC CENTRIFUGAL LIQUID CHILLER

Models: 19XR XRV

1 140
Download 140 pages 13.24 Kb
Page 125
Image 125
INITIAL START-UP CHECKLIST

INITIAL START-UP CHECKLIST

FOR 19XR, XRV HERMETIC CENTRIFUGAL LIQUID CHILLER

(Remove and use for job file.)

MACHINE INFORMATION:

 

 

 

 

 

 

 

 

 

 

NAME

 

 

 

JOB NO.

 

 

 

 

 

ADDRESS

 

 

 

MODEL

 

 

 

 

 

 

CITY

 

 

STATE

 

ZIP

 

 

S/N

 

 

DESIGN CONDITIONS:

 

TONS

BRINE

FLOW

TEMPERATURE

TEMPERATURE

PRESSURE

PASS

SUCTION

CONDENSER

 

RATE

IN

OUT

DROP

TEMPERATURE

TEMPERATURE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COOLER

 

 

 

 

 

 

 

 

******

 

 

 

 

 

 

 

 

 

 

CONDENSER

 

 

 

 

 

 

 

******

 

COMPRESSOR:

Volts

 

RLA

 

 

 

OLTA

STARTER:

Mfg

 

 

Type

 

 

 

S/N

OIL PUMP:

Volts

 

RLA

 

 

 

OLTA

CONTROL/OIL HEATER:

Volts

115

 

230

 

 

REFRIGERANT: Type:

 

 

Charge

 

 

 

 

 

CARRIER OBLIGATIONS:

Assemble

. . . . . . .

. . . . . . . Yes

No

 

 

Leak Test

.

. . . . . . . . . Yes

No

 

 

Dehydrate . . .

. . . . . . .

. . . . . . . . Yes

No

 

 

Charging . . . .

. . . . . . .

. . . . . . . . Yes U

No U

 

 

Operating Instructions

 

 

Hrs.

START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS

JOB DATA REQUIRED:

U

U

 

1.

Machine Installation Instructions . . . .

. . . . . . . .

. . . . . . Yes

No

2.

Machine Assembly, Wiring and Piping Diagrams

. . . . . . Yes

No

3.

Starting Equipment Details and Wiring Diagrams

. . . . . . Yes

No

4.

Applicable Design Data (see above) . .

. . . . . . . .

. . . . . . Yes

No

5.

Diagrams and Instructions for Special Controls .

. . . . . . Yes U

No U

INITIAL MACHINE PRESSURE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YES

NO

 

 

 

 

 

 

 

Was Machine Tight?

 

 

 

 

 

If Not, Were Leaks Corrected?

Was Machine Dehydrated After Repairs?

 

CHECK OIL LEVEL AND RECORD:

 

3/4

 

 

ADD OIL:

Yes

No

 

 

 

 

 

 

 

 

 

 

 

 

 

1/41/2 Top sight glass

Amount:

 

 

U

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/2 Bottom sight glass

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RECORD PRESSURE DROPS:

Cooler

 

 

Condenser

 

 

 

 

 

CHARGE REFRIGERANT:

Initial Charge

 

 

 

 

 

 

 

 

Final Charge

 

After TrimU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

 

Book

2

PC 211

Catalog No. 531-982

Printed in U.S.A.

Form 19XR-5SS

Pg CL-1

6-01

Replaces: 19XR-4SS

 

Tab

5a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 125
Image 125
Carrier Initial Start-Up Checklist, FOR 19XR, XRV HERMETIC CENTRIFUGAL LIQUID CHILLER, Remove and use for job file