5-28
CiscoASR 9000 Series Aggregation Services Router Hardware Installation Guide
Chapter5 Replacing Cisco ASR 9000 Series Router Components
Installing a Replacement Chassis in the Equipment Rack
Installing a Replacement Chassis in the Equipment Rack
Follow these steps to install the replacement chassis and components in the equipment rack:
Step1 Install the new chassis in the rack (see Rack-Mounting the Router Chassis, page2-42).
Step2 Install the power modules (see Removing and Replacing Power System Components, page 5-12).
Step3 Install the fan tray (see Removing and Replacing the Fan Trays, page5-11).
Step4 Install the RSP cards, RP cards, FCs, and LCs. (see Removing and Replacing Cards from the Chassis,
page 5-25).
Step5 Install the chassis air filter (see Replacing the Chassis Air Filter, page5-4 ).
Step6 Connect all line card and interface cables (see Connecting Line Card Network Interface Cables,
page 3-17).
Step7 Connect the supplemental bonding and grounding connection (if there is one) to the chassis (see
Supplemental Bonding and Grounding Connections, page2-56).
Step8 Connect power to the power trays on the rear of the chassis.
For AC power modules, see Reconnecting AC Power, page5-17.
For DC power modules, see Reconnecting DC Power, page5-20.
Step9 To turn on power to the router, see Powering On the Router, page3-32.
Packing a Chassis for Shipment
Use the packaging that came with the replacement chassis to repack and ship the chassis being replaced.
Before shipping the chassis being replaced, pack the chassis back into the shipping rack (see Unpacking
the Router, page2-3).