2-17
CiscoASR 9000 Series Aggregation Services Router Hardware Installation Guide
Chapter2 Unpacking and Installing the Chassis
Unpacking the Router
Positioning the Router Positioning the Cisco ASR 9010 Router, Cisco ASR 9006 Router, and Cisco 9904 Router
Use a safety hand truck to move the CiscoASR 9010 Router, Cisco ASR 9006 Router, or
Cisco ASR 9904 Router router to its final location for rack installation.
Positioning the and Cisco ASR 9922 Router and Cisco ASR 9912 Router
TheCisco ASR 9922 Router and Cisco ASR 9912 Router and each ship in a carton similar to the CRS-1
16-Slot shipping carton. Each chassis is installed in a shipping rack used only for shipping purposes.
Remove the chassis from the shipping rack before installing it into the rack.
To prepare the 19-inch 45-RU rack:
Step1 Install the two guide rails onto the bottom of the rack.
The guide rails are included with the ASR-9922-ACC-KIT and ASR-9912-ACC-KIT accessory kits.
Each accessory kit ships with the chassis and includes the guide rails, grounding lug, associated
hardware, and a warranty card.
Step2 Use screws to fasten these two guide rails onto the front and rear rails of the rack.
The two guide rails at the bottom of the rack (Figure2-8) have six holes (three per rail) that
accommodate 12-24 or M6 screws. If you are using smaller 10-32 screws, you must use bushings to fit
the larger holes (Figure 2-13).
Figure2-13 One 10-32 Screw with Bushings in Guide Rail Holes
Note Delrin bushings with part number 17234-D-1 can be obtained from ASM at
www.accuratescrew.com.
Step3 Remove the shipping carton, plastic covering, rear brackets, attachment screws and bolts, shipping rack
bar, and any cosmetic accessories included with the chassis.
303498