Index
IN-7
Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide
OL-26701-02
power-on self-test 4-9
route processor (RP)
See RP

S

safety
compliance information 1-3
general guidelines 1-2
SELV circuit connections 3-16
SELV circuit
connections 1-21, 3-16
warning 1-21
See also safety
serial ports, asynchronous
See auxiliary port; console port
SFP modules
copper A-5
CWDM A-5, A-6
DWDM A-6
installing and removing 3-11
shock specifications, system A-2
show environment all command 4-19
show environment command 4-6, 4-19
show version command 4-1
site requirements
air flow 1-7
grounding lug 1-18
layout 1-5
permanent ground connection to central office ground
system 1-20
rack mounting 1-8
site log B-1
supplemental earth ground connection 1-20
temperature and humidity 1-12
site wiring
guidelines 1-7
specifications
AC-input power subsystem A-3
acoustic noise A-2
altitude A-2
Cisco ASR 9000 Series A-1
DC-input power subsystem A-3
humidity A-2
shock A-2
temperature A-2
vibration A-2
switch 1-26
sync port
connection guidelines 1-26
syslog 4-17

T

telco rack
See racks, telco 2-post
temperature
air flow guidelines 1-7
guidelines 1-12
overtemperature conditions 4-19
system specifications A-2
troubleshooting 4-18
troubleshooting
AC-input power 4-3 to ??
AC-input power supply 4-3
advanced 4-17
commands 4-17
console logs 4-17
cooling subsystem 4-18
DC-input power 4-5
environmental shutdown 4-19
fan tray 4-19
line cards 4-13, 4-17
overview 4-1
power distribution system 4-8
power subsystem 4-3
power system 4-6
RP subsystem 4-9