2. WIRING

Wiring consideration

To lessen the chance of picking up electrical interference, avoid where possible routing the signal cable near other onboard electrical equipment (radars, transmitting radio antennas, etc.) Also avoid running the cable in parallel with power cables. When crossing with other cable, the angle should be 90°to minimize the magnetic field coupling.

The signal cable run between the antenna and processor units is available in lengths of 15 m (standard), 30 m and 50 m. Whatever length is used it must be unbroken; namely, no splicing allowed. Use the signal cable as short as possible to minimize attenuation of the signal.

The radar should be connected to an emergency power source, as required by SOLAS II-1.

2.1Interconnection

Monitor unit

Antenna unit

POWER SUPPLY

UNIT PSU-007

 

 

 

 

 

 

220

VAC, 3φ, 60 Hz

-2.5

200

VAC, 3φ, 50 Hz

 

 

440

VAC, 3φ, 60 Hz

TPYCY

 

380

VAC, 3φ, 50 Hz

 

 

 

For HSC

 

 

 

 

220

VAC, 3φ, 50 Hz

 

 

 

 

 

 

220

VAC, 3φ, 60 Hz

 

440

VAC, 3φ, 60 Hz

 

110

VAC, 3φ,

*

 

 

RU-5693

 

60 Hz

*

 

 

220

VAC, 3φ,

 

 

RU-6522

 

50 Hz

*

 

 

440

VAC, 3φ,

RU-5466-1

 

50 Hz

 

 

 

 

DPYC-1.5

TPYCY-2.5

TB801

TB802

Junction Box

RJB-001**

RW-9600 15/30/40/50 m (Max.100 m)

Processor unit

DVI-D/D SINGLELINK, 5 m/10 m

DPYC-2.5

Control unit (RCU-014 or RCU-015)

100-230 VAC

XH10P-W-5P-A

 

L=10/20/30m

 

 

 

 

XH10P-W-6P L=1.5/10/20/30 m

Memory card I/F unit Junction Box

DPYC-2.5

CU-200-FAR

RJB-001**

 

 

 

 

 

 

 

 

100-115 VAC/220-230 VAC

*: Not available for HSC

**: If the length of the antenna cable is more than 100m, use Junction box RJB-001. However, the maximum length is 300m.

: Cable requires fabrication

Control unit (RCU-016)

F1

F2

F3

F4

Standard Interconnection

2-1

Page 27
Image 27
Furuno 2137S-BB, 2837S installation manual Wiring consideration, Standard Interconnection