Making Measurements
Measuring Jitter Transfer
HOW TO: | Start the Jitter Transfer Measurement | ||||||||
| The Jitter Transfer measurement must be started within 10 minutes of | ||||||||
NOTE | |||||||||
| the completion of calibration. | ||||||||
| 1 After the CALIBRATION is completed, remove the back to back | ||||||||
| |||||||||
|
| connection from the DSn or SONET or optical interfaces. | |||||||
|
| If the measurement is to be made at a network equipment monitor | |||||||
|
| point, choose | MONITOR | on the DSn or SONET RECEIVE display | |||||
|
| before making | the jitter | transfer measurement. | |||||
| 2 Choose MODE |
| on the TRANSMIT |
| display and | ||||
| MEASURE | JITTER | |||||||
|
| press RUN/STOP | . |
|
|
| |||
|
| ||||||||
|
| The measurement’s progress can be monitored on the TRANSMIT | |||||||
|
| display. At the end of the test the graph can be viewed on the RESULTS | |||||||
|
| JITTER | display. |
95