Making Measurements

Measuring Jitter Transfer

HOW TO:

Start the Jitter Transfer Measurement

 

The Jitter Transfer measurement must be started within 10 minutes of

NOTE

 

the completion of calibration.

 

1 After the CALIBRATION is completed, remove the back to back

 

 

 

connection from the DSn or SONET or optical interfaces.

 

 

If the measurement is to be made at a network equipment monitor

 

 

point, choose

MONITOR

on the DSn or SONET RECEIVE display

 

 

before making

the jitter

transfer measurement.

 

2 Choose MODE

 

on the TRANSMIT

 

display and

 

MEASURE

JITTER

 

 

press RUN/STOP

.

 

 

 

 

 

 

 

The measurement’s progress can be monitored on the TRANSMIT

 

 

display. At the end of the test the graph can be viewed on the RESULTS

 

 

JITTER

display.

95

Page 105
Image 105
HP BER 718 37718A manual Start the Jitter Transfer Measurement