Making Measurements

Test Timing

Test Timing

Description There are two aspects to test timing:

Error results may be displayed as short term or cumulative over the measurement period.If short term error measurements are required, the short term period may be selected.

The period of the test may be defined or controlled manually.

HOW TO:

1 Choose

TIMING CONTROL

on the RESULTS display.

2Choose the SHORT TERM PERIOD to the timing required for short term results.

3Choose the type of TEST TIMING required:

For manual control with RUN/STOP choose MANUAL .

For a single timed measurement period started with RUN/STOP , choose SINGLE and choose the Test duration.

For a timed period starting at a specified time, choose TIMED , choose the Test duration and the test START date and time.

69

Page 79
Image 79
HP BER 718 37718A manual Test Timing