1

2

3

4

5

6

7

WAN

1

To host

4

Library controller card terminator connection

2 Master to cartridge elevator

5

10BaseT connections

3

Cartridge elevator to secondary master

 

 

Figure 85. Four module library cabling

2.Install a terminator on the master library controller adapter connection.

3.Optional: Connect the WAN point to the host with a 10BaseT cable as shown in Figure 64 on page 71 and Figure 85. This step is applicable to systems that utilize a host. (For WEB TLC operations.)

4.Using 10BaseT cable, connect a cable from router port 1 to the primary master SDLT module. See Figure 64 on page 71 and Figure 85.

5.Connect a cable from router port 2 to the secondary master.

6.Continue connecting cables, router port 3 to the third module, port 4 to the fourth module and so on until all modules are connected to the router. Ensure the power is off before proceeding with steps 7 and 8.

864560SLX Tape Library: User’s Guide

Page 96
Image 96
IBM 4560SLX warranty Four module library cabling