IBM 4560SLX warranty Tie bar installation

Models: 4560SLX

1 128
Download 128 pages 53.32 Kb
Page 90
Image 90

Figure 76. Tie bar installation

c.Attach the large tie bars with the four mounting screws so that the beveled edge is facing the inside corner of the chassis and extension.

9.Remove the bottom stop standoff from the primary chassis and attach it to the cartridge elevator extension in the corresponding mounting hole as shown in Figure 76.

10.Attach the tensioner springs mounting hardware and springs.

11.Attach the tensioner ramp/idler pulley components to the cartridge elevator extension in the same manner as shown in Figure 74 on page 79.

12.On the tensioner ramp/idler pulley base of the base expansion section, compress the springs until the holes in the tensioner ramp are aligned with the holes in the base of the tensioner, and insert a 0.05 in. allen wrench through the holes. This sets the idler pulley to the zero position.

13.Cut the new timing belt supplied with the expansion kit (between the teeth) to the appropriate size for the total number of modules used as shown in Table 8.

The timing belt supplied with the expansion kits is marked and numbered at the appropriate cut points.

Table 8. Timing belt lengths

Number of modules

Number of teeth

Length of belt

Length of belt

 

 

(Centimeters)

(Inches)

 

 

 

 

2

169

85.8

33 13/16

 

 

 

 

3

257

130.6

51 3/8

 

 

 

 

4

344

174.8

68 13/16

 

 

 

 

5

432

219.5

86 3/8

 

 

 

 

6

519

263.6

103 13/16

 

 

 

 

7

607

308.4

121 3/8

 

 

 

 

8

694

352.6

138 13/16

 

 

 

 

14.Thread the timing belt counter-clockwise through the top of the tensioner ramp/idler pulley and clockwise through the motor drive pulley as shown in Figure 77 on page 81 and Figure 78 on page 81.

804560SLX Tape Library: User’s Guide

Page 90
Image 90
IBM 4560SLX warranty Tie bar installation