Testing the built application

Annmarie is the tester for the MVS version of the robot application. When she receives noti®cation that the test record is in the ready state, she tests the part changes that were made within the release by Alex and several of his team members. The tests complete successfully, so she accepts the test record by doing one of the following:

GUI

From the GUI, she:

1.Selects Records Test records Accept from the Actions pull-down menu on the Tasks window.

2.Types 456 in the Work areas ®eld, and selectsrobot_control from the Releases ®eld andMVS from the Environments ®eld.

3.Selects OK.

Figure 41. Accept Test Records window

Command

From a command line, she issues the following command:

teamc test -accept -workarea 456 -release robot_control -env mvs

Results

Annmarie's test record moves to the accept state. However, work area 456 will not go to the complete state until Tim, who is the tester for the OS/2 environment, marks his test record.

After all test records are moved from the ready state, the work area moves to the complete state. Because the component process includes the verifyDefect subprocess, defect 456 moves to the verify state. A veri®cation record for the defect is created in the ready state.