Verification of Shipping Cartons

Table 37: Downstream CMTS Parameter Characterization

Downstream Parameters

Port 0

Port 1

Port 2

Port 3

 

 

 

 

 

DOCSIS Module #___

 

 

 

 

 

 

 

 

 

Node combining ratio per port

____ : 1

____ : 1

____ : 1

____ : 1

 

 

 

 

 

Interface frequency allocated

____ MHz

____ MHz

____ MHz

____ MHz

 

 

 

 

 

Modulation type

_ 64QAM _256QAM

_ 64QAM _256QAM

_ 64QAM _256QAM

_ 64QAM _256QAM

 

 

 

 

 

Output signal level (relative to analog

____ dB

____ dB

____ dB

____ dB

video)

 

 

 

 

 

 

 

 

 

Required interface output level

____ dBmV

____ dBmV

____ dBmV

____ dBmV

 

 

 

 

 

Interleave depth setting

___ [I] (# of taps)

___ [I] (# of taps)

___ [I] (# of taps)

___ [I] (# of taps)

 

___ [J] (increments)

___ [J] (increments)

___ [J] (increments)

___ [J] (increments)

 

 

 

 

 

Verification of Shipping Cartons

Prior to beginning the installation of the G10 CMTS, you should verify that the contents of the shipping cartons are identical to the contents listed on the packing lists. In addition, you should carefully inspect the shipped contents to ensure that they are not damaged in any manner. If any contents are missing or damaged, report this to customer support.

To verify the contents of the shipping cartons match the packing list, use the following procedure:

1.Carefully open the shipping cartons. Pay attention to any instructions printed on each shipping carton.

2.Remove all the contents of the shipping cartons. When lifting heavy contents, be sure to follow the safety precautions listed in “Safety Precautions” on page 68.

3.Verify that the contents of the shipping cartons are identical to the contents listed on the packing lists.

4.Verify that the correct number of power supplies are installed in the G10 CMTS chassis.

5.Open all accessory kits that are included in the shipment. Verify that the contents are identical to the contents listed on the accessory kit packing lists.

6.Install the power supply faceplate included in the shipment by aligning its four ball studs with the four power supply faceplate clips and pressing the faceplate towards the chassis until it snaps into place. If you will install additional power supplies, this step can be deferred.

You must install the power supply faceplate prior to powering on the G10 CMTS to ensure that proper air ventilation occurs throughout the chassis.

7.Install the air intake faceplate included in the shipment by aligning its four ball studs with the four air intake faceplate clips and pressing the faceplate towards the chassis until it snaps into place.