Mounting

Mounting

 

 

 

 

 

 

The G10 CMTS can be mounted in a 19-inch EIA RS-310-C equipment rack or a 23-inch AT&T

DATAPHONE equipment rack. You can install the CMTS into non-standard racks by using the

additional rail mounting bracket holes in the CMTS.

 

 

 

 

 

 

 

 

 

 

We recommend that you rack mount systems from the

 

 

 

 

bottom up to maintain the lowest possible center of gravity

 

 

of the entire rack with its equipment.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

We recommend that you use an equipment shelf or tray

 

 

 

 

beneath the CMTS to support its weight. The shelf avoids

 

 

backward toppling of the rack and excess torque on the

 

 

mounting brackets.

 

 

 

 

 

 

 

 

 

 

We recommend you use a cable organizer to assist with the routing of cables to and from the

equipment rack. You should mount the cable organizer after the CMTS is installed.

 

 

 

For thermal management, airflow enters into the lower front and sides of the CMTS chassis

and exits through the upper rear. As a result, a clearance of 3 to 6 inches is required on each

side of the CMTS. You can mount additional equipment directly on either the top or the

bottom of the CMTS without impacting system ventilation.

 

 

 

 

 

 

 

 

 

 

 

 

 

We recommend that you locate neighboring equipment

 

 

such that its ventilation exhaust does not feed into the

 

 

CMTS air intakes.

 

 

 

 

 

 

 

We recommend that you maintain proper clearance to the front and rear of the mounting

rack so that the CMTS can be easily accessed during maintenance. The recommended

clearance to the front and rear of the chassis is 3 feet and 2 feet.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prepare the Site

73

 

Page 89
Image 89
Juniper Networks G10 CMTS manual Mounting