Juniper Networks G10 CMTS manual Initial Installation

Models: G10 CMTS

1 210
Download 210 pages 10.01 Kb
Page 5
Image 5

Part 2

 

Initial Installation

 

Chapter 4

 

Prepare the Site

67

Safety Precautions

68

Notices

70

Power

71

AC Power

71

DC Power

72

Environment

72

Mounting

73

Tools and Equipment Required for Installation

74

Coaxial Cable Requirements

75

Characterization of Installation Site

75

Summary Checklist

82

Noise Measurement Methodology

83

Average Upstream Noise Measurement

83

Peak Upstream Noise Measurement

84

Additional Characterization Tables

85

Verification of Shipping Cartons

89

G10 CMTS Installation Checklist

90

Chapter 5

 

Install the CMTS

93

Ground the Chassis

94

Rack Mounting

94

Install Power Supplies

101

Install a DOCSIS Module

103

Install an HFC Connector Module or SIM

105

Install a Chassis Control Module

108

Install a Hard Disk Module

108

Install a NIC Module

108

Install a NIC Access Module

108

Cable an HFC Connector Module or SIM

109

Cable the F-connector Ports

109

Cable a Chassis Control Module

113

Cable a NIC Module

113

Cable a NIC Access Module

115

Attach a PC to the Chassis Control Module

119

Connect to Power Sources

119

AC Power

119

DC Power

121

Table of Contents

v

Page 5
Image 5
Juniper Networks G10 CMTS manual Initial Installation