Juniper Networks G10 CMTS manual Summary Checklist

Models: G10 CMTS

1 210
Download 210 pages 10.01 Kb
Page 98
Image 98

Summary Checklist

Summary Checklist

 

 

 

 

Table 32 provides a summary checklist of the pre-installation requirements. You should

 

complete and review this checklist with field engineers to ensure the installation site is

 

prepared for installing the G10 CMTS.

 

 

 

 

 

 

 

Table 32: Pre-Installation Requirement Summary Checklist

 

 

 

 

 

 

 

 

Requirement

Verified

 

 

 

 

 

Safety

 

 

 

 

 

 

 

Grounding straps provided for ESD protection

 

 

 

 

 

Compliance verified with all local and national regulatory requirements

 

 

 

 

 

Equipment to be positioned in a clear, dry, dust-free area

 

 

 

 

 

 

 

Power

 

 

 

 

 

 

 

AC Power

 

 

 

 

 

AC-input supply operates within range of 100 to 240 VAC and 47 to 63 Hz

 

 

 

 

 

 

 

Appropriate circuit protection in place for compliance with area electric regulations

 

 

 

 

 

 

 

Separate AC-input power supply sources for CMTS A and B domains

 

 

DC Power

 

 

 

 

 

DC-input supply operates within range of –36 to –75 VDC

 

 

 

 

 

 

 

Appropriate circuit protection in place for compliance with area electric regulations

 

 

 

 

 

 

 

Separate DC-input power supply sources for CMTS A and B domains

 

 

 

 

 

Environment

 

 

 

 

 

Ambient temperature conditions satisfied

 

 

 

 

 

 

 

Ambient humidity conditions satisfied

 

 

 

 

Altitude conditions satisfied

 

 

 

 

 

Vibration conditions satisfied

 

 

 

 

 

 

 

Mounting

 

 

 

 

 

 

 

19-inch rack, 23-inch rack, or appropriate non-standard rack or shelf available

 

 

Cable organizer available for mounting rack

 

 

 

 

 

Adequate access clearance to front, rear, and sides of CMTS

 

 

 

 

 

 

 

Hardware

 

 

 

 

 

 

 

Specified tools and supplies available

 

 

 

 

 

Test equipment available for installation and verifying RF setup

 

 

 

 

 

Installation Site

 

 

 

 

 

 

 

Characterization of RF Plant/HFC environment parameters completed

 

 

Characterization of existing DOCSIS services completed

 

 

 

 

 

Characterization of upstream CMTS parameters completed

 

 

 

 

 

 

 

Characterization of downstream CMTS parameters completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

82

JUNOSg 3.0 G10 CMTS Hardware Guide

 

Page 98
Image 98
Juniper Networks G10 CMTS manual Summary Checklist