J2320, J2350, J4350, and J6350 Services Router Getting Started Guide

EIA-530A DTE Cable Pinout

Table 76: EIA-530A DTE Cable Pinout

LFH-60 Pin

DB-25 Pin

LFH-60 Pairing

Description

15

1

Shield Ground

60

2

59

Transmit Data (A)

1

3

2

Receive Data (A)

48

4

47

Request to Send (A)

37

5

38

Clear to Send (A)

9

6

Data Set Ready (A)

57

7

Signal Ground

13

8

14

Received Line Signal Detector (A)

6

9

5

Receive Clock (B)

14

10

13

Received Line Signal Detector (B)

51

11

52

Terminal Timing (B)

55

12

56

Transmit Clock (B)

38

13

37

Clear to Send (B)

59

14

60

Transmit Data (B)

56

15

55

Transmit Clock (A)

2

16

1

Receive Data (B)

5

17

6

Receive Clock (A)

41

18

Local Loopback

47

19

48

Request to Send (B)

33

20

Data Terminal Ready (A)

4

23

Signal Ground

52

24

51

Terminal Timing (A)

26 to 25

30 to 29

18 to 17

228Serial PIM Cable Specifications

Page 250
Image 250
Juniper Networks J6350, J4350 manual EIA-530A DTE Cable Pinout