Chapter 6: Installing and Connecting a Services Router

c.With a Phillips screwdriver, remove the screw and washer from the PEM nuts at the grounding point on the rear of the chassis.

d.Place the grounding lug at the other end of the cable over the grounding point, as shown in Figure 62 on page 125 through Figure 64 on page 126.

e.Secure the cable lug to the grounding point, first with the washer, then with the screw. On J2320 and J2350 routers, use the screw containing a captive washer to secure the cable lug to the grounding point.

3.Locate the power cord or cords shipped with the router, which has a plug appropriate for your geographical location. For power cord specifications, see “Power Guidelines, Requirements, and Specifications” on page 107.

4.For the power supply:

a.Insert the appliance coupler end of a power cord into the appliance inlet on the power supply faceplate, as shown in Figure 62 on page 125 through Figure 64 on page 126.

b.Insert the plug into an AC power source receptacle.

5.Verify that the power cord does not block access to router components or drape where people can trip on it.

6.On J2320 and J2350 routers, use the power cable tie as follows to relieve strain on the cable (see Figure 62 on page 125 and Figure 63 on page 126):

a.Wrap the loose end of the tie around the cable, and insert it into the opening on the tie.

b.Pull the end to tighten the tie.

To release the tie from the cable, press down the tab on the tie and loosen it.

Figure 62: Connecting AC Power to the J2320 Services Router

Connecting Power 125

Page 147
Image 147
Juniper Networks J4350, J6350 manual Connecting AC Power to the J2320 Services Router