TOC

TOC

F-49

F-49

TROUBLESHOOTING & REPAIR

SCR REMOVAL AND REPLACEMENT (continued)

Return to Section

Return to Section TOC

Return to Section TOC

Return to Master

Return to Master TOC

Return to Master TOC

CLAMPING PROCEDURE

FOR 1/4-28 CAP SCREWS

NOTE: This procedure can only be used with 1/4-28 cap screws.

Do not use cap screws with any other type thread or new SCR will be damaged.

Do not over tighten cap screws. The leaf spring will apply the required clamping force to the SCR.

1.Do not turn the nuts. While holding the nuts stationary, turn the cap screws only with the following procedure.

2.Tighten first cap screw 1/4 turn.

3.Tighten second cap screw 1/2 turn.

4.Tighten first cap screw 1/2 turn.

5.Tighten second cap screw 1/2 turn.

6.Tighten first cap screw 1/4 turn. Stop.

7.Assembly now has the proper clamping force.

8.Perform the Active SCR Test.

CLAMPING PROCEDURE

FOR 1/4-20 CAP SCREWS

NOTE: This procedure can only be used with 1/4-20 cap screws.

Do not use cap screws with any other type thread or new SCR will be damaged.

Do not over tighten cap screws. The leaf spring will apply the required clamping force to the SCR.

1.Do not turn the nuts. While holding the nuts stationary, turn the cap screws only with the following procedure.

2.Tighten first cap screw 1/4 turn.

3.Tighten second cap screw 1/2 turn.

4.Tighten first cap screw 1/2 turn.

5.Tighten second cap screw 1/4 turn. STOP.

6.Assembly now has the proper clamping force.

7.Perform the Active SCR Test.

Return to Section TOC

Return to Master TOC

IDEALARC DC-400

LINCOLN ®

ELECTRIC

Page 93
Image 93
Lincoln Electric SVM 122-A Clamping Procedure For 1/4-28 CAP Screws, Clamping Procedure For 1/4-20 CAP Screws