
Chapter 7 Maintenance
7.8 List of expendable parts
Note
Parts name | Parts code | Unit | When to replace | |
|
|
|
| |
NT cutter blade | 200400107 | 1 set (contains 10 blades) | After cutting | |
two plate rolls. | ||||
|
|
| ||
Pump unit (EAC) | U1105011 | 1 set | After completing 25000 | |
prepress processes. | ||||
Pump unit (EST) | U1105012 | 1 set | After completing 25000 | |
prepress processes. | ||||
|
|
|
-After 25000 prepress processes, a "Pump Check" message appears on the display panel when the power switch is turned ON.
This indicates that it is time to replace the pump, so please contact the serviceman and request a pump replacement.
Always replace the pump units for EAC and EST at the same time.
Clear this panel display by pressing the RESET key and continue the initial inspection.
-Average lifetime varies depending on the usage condition (input voltage, ambient environment, temperature, humidity, and daily maintenance).
-When expendable parts noted in the list must be replaced, customers will be charged for labor and parts costs even if the equipment is still within its warrantee period.
7.9 How to order parts
The
(1)Indicate whether you just need the parts, or whether you need to have them replaced by service personnel.
(2)Information from your warranty or machine name plate
i)Model:
ii)Serial number
(3)Names and numbers of necessary parts, quantities, date required
Caution
-Please be aware that new models may be developed and specifications may change without notice, so parts may differ from those listed in this
operation manual.
-Mitsubishi Paper Mills Ltd. takes no responsibility for improvements users may undertake on their own or in collaboration with another company.
- 65 -