Sheet 1/1
Operation Test
1. OPERATION TEST
Confirm the entered system data and hardware, including cable connection, by completing the following operational tests.
•Basic Connection Test at MDF
-Station Line Test (Operator Call from all stations)
-Central Office Trunk Test (Incoming, Outgoing)
-Tie Line Trunk Test (Incoming, Outgoing)
•Service Feature Test
-Call Transfer
-Step Call
-Executive Right of Way
-Call Hold
-Call Back
-Call
-Call Pickup
-Station
-Speed
-Paging Access
-Announcement Service
-etc.
NDA-24219 CHAPTER 3
Page 125
Revision 2.0