
3. HOW TO FOLLOW THIS MANUAL
The Installation Procedure is shown by means of flowcharts with an NAP (NEC Action Procedure) Number. The detail of the work for each step is described in corresponding NAP.
4. SCOPE OF INSTALLATION PROCEDURES
This manual covers the installation shown in Figure 1-2.
| ||
INSTALLATION OF MAIN EQUIPMENT |
| |
| ||
SWITCH SETTING OF CIRCUIT CARDS |
| |
| ||
MOUNTING OF CIRCUIT CARDS |
| |
| MDF | |
| SN610 | |
| ATTCON | |
| or | |
| DESKCON | |
| Multiline Terminal | |
MDF CABLE |
| |
| APR Adapter | |
| ||
CABLE RUNNING |
| |
TO MDF | Single Line Telephone | |
| ||
TERMINATION OF |
| |
CABLES ON MDF | TO TAS INDICATOR, ALM | |
| ||
| INDICATOR |
Figure 1-2 Scope of Installation Procedures
CHAPTER 1 |
Page 2
Revision 2.0