NDA-24219 CHAPTER 3

Page 39

Revision 2.0

NAP-200-003

Sheet 10/12

Installation of Main Equipment

Figure 003-7 Cable Connection on PZ-PW86/PW112 (Continued)

PZ-PW112
MJ
MN
ON
GND Note
FG
–27V
PWR CNT CA-A/
TO PWR1
AC CORD-A TO AC MAINS INPUT
TO
CONNECTOR
TO AUXILIARY
BATTERY CONNECTOR (BATT2)
ON
OFF
EQUIPMENT
GREEN
WHITE
BLACK
FRAME GROUND
Note: If GND (Signal GND) has to beseparated from FG (Frame GND),remove the link between GND andFG terminal
O
TERMINAL ON THE
TO OTHER PZ-PW112
PWR CA-A
TO BATTERY OR
OTHER PZ-PW112
BATTERY CONNECTOR (BATT1)
BATTERY CABLE/PWR CA-A
CHASSIS

• PZ-PW112

TO PWR0A CONNECTOR
POWER OUTPUT
CABLE (+5V, –27V,E)
PWR CNT CA-C