
Sheet 1/4
Connection of Battery
1. BATTERY CONNECTION
CAUTION 1: 24V batteries must be used in this system.
CAUTION 2: If battery terminals (+,
•When mounting batteries:
(1)Connect the battery cable to the batteries.
(2)Mount the batteries into the appointed position of the PIM.
(3)Connect the battery cable to the
•When removing batteries:
(1)Disconnect the battery cable from the
(2)Remove the batteries from the PIM.
|
| Standard Battery |
| |
Internal Battery | : | GS type PX 12026 |
| |
|
|
|
| |
|
|
|
| |
|
| Optional Battery |
| |
External Battery | : | YUASA | type | |
|
| MATUSHITA | type |
These batteries will provide 30 minutes of battery backup. They will not fit within the NEAX1000 PIM.
CHAPTER 3 |
Page 44
Revision 2.0