COMSPHERE 3000 Series Carrier
2-2 December 1994 3000-A2-GA31-80
Customer Responsibilities
Preparing the installation site, including securing ac
power with proper grounding, and verifying that you have
the appropriate components for your site requirements are
your responsibility. You can call your AT&T Paradyne
representative, however, if you need assistance or have
any questions.
When you order your COMSPHERE 3000 Series
Carrier, certain components are supplied with your carrier;
other components must be ordered separately.
Supplied with the carrier:
3000 Series Carrier assembly
Fuses
Cable ties
Signal ground/frame ground strap
You are responsible for ordering/supplying the
following equipment:
COMSPHERE 72-inch cabinet, or other non-AT&T
Paradyne EIA standard 19- or 23-inch wide cabinet.
Power transformer unit.
Fan module(s), if needed.
SDCP.
Speaker panel (for use with the Models 3811 and
3911 modems), if needed.
One digital or leased network interface cable for
each of the eight DSUs or modems.
TDM (and MCMP) and/or digital bridge interface
cables, if needed.
One or two Network Interface Modules (NIMs), if
needed.
One or two dial network interface cables, if needed.
Connecting cables and cords. (For a complete list of
the available cables and cords, see Appendix B of
this manual.)
Rear connector plates for optional pre-mounting.
(Modular devices are packaged with rear connector
plates, but you can also order rear connector plates
separately.)
Shared Diagnostic Unit (SDU), if needed.
3151/3161 Auxiliary Backplanes, if needed.
T1 CSUs, T1 DSU/CSUs, DSUs, DBM-Vs,
DBM-Ss, DBM-Ds, and/or dial/lease modems, and
options needed (DBMs, TDMs, MCMPs).
Filler panels for empty slots.
Applicable manuals
An equipment list is included at the end of this manual
to assist you in ordering any additional components you
may require.
Installation Considerations
Your installation site should be well-ventilated, clean,
and free of environmental extremes. There should be 2 to
3 feet of clearance at the front and rear of the cabinet in
which the carrier is to be installed to allow access for
installation of the power transformer unit, (optional) fan
module, and (optional) SDCP, as well as the network
interface connectors, rear connector plates, and DTE
cables.
HANDLING PRECAUTIONS
FOR
STATIC SENSITIVE DEVICES
AT&T Paradyne products are
designed to protect sensitive
components from damage due to
electrostatic discharge (ESD)
during normal operation. When
performing installation
procedures, however, take
proper static control precautions
to prevent damage to
equipment. If you are not sure of
the proper static control
precautions, contact the nearest
AT&T Paradyne Customer
Support office.