Maintenance

Updating PLC System Executives in an IEC HSBY System

Updating PLC

In a Pre Concept 2.5 IEC Hot Standby System it’s not possible to update the PLC

System

system executives without shutting down the process. Instead you must follow the

Executives

steps in the table below.

 

Concept 2.5 IEC Hot Standby System allows the upgrading of the controllers

 

executives without shutting down the system. See Advanced Options, Section

 

B122.

 

 

 

 

 

CAUTION

 

 

 

 

 

Executing the Steps Hazard

Quantum IEC Hot

Standby

Controller Exec

Upgrade

Procedure

Following the procedural steps in order is critical for the safety and reliability of your Hot Standby system.

Failure to follow this precaution can result in injury or equipment damage.

The following table shows the steps in a Quantum IEC Hot Standby Controller Exec Upgrade Procedure.

Step

Action

 

 

 

 

1

Stop the process being controlled.

 

 

 

 

2

Stop both controllers.

 

 

 

 

3

Load the new Execs in both controllers.

 

 

 

 

4

Download the project to the primary controller. Note: Some Exec upgrades may

 

 

be because of new versions of Concept and in certain cases the project may

 

 

have to be converted before downloading. Note: The Primary controller must be

 

 

started.

 

 

 

 

5

Load the project into the Standby Controller via the fiber optic CHS link in

 

 

Transfer mode.

 

 

 

 

6

Start the Standby Controller. Note: You can do this by using the CHS fiber optic

 

 

update procedure, without using Concept.

 

 

Result: The IEC Hot Standby System will now come up and run in Normal

 

 

Recommended Operation.

 

 

 

 

 

 

 