Schneider Electric 840 USE 106 0 manual 140, CHS 110 RIO Head

Models: 840 USE 106 0

1 226
Download 226 pages 11.66 Kb
Page 139
Image 139

Using a Quantum IEC Hot Standby System

Start Standby The following table shows the steps to starting Standby.

Step

Action

1Start the Standby controller.

2Check the LED display. If the system is functioning normally, the display should be as follows:

On the CHS 110 module, all three indicators should be steady, not blinking.

A blinking Com Act light signals that your system has detected an error.

lOn the corresponding CRP module, the Ready indicator is a steady green. The Com Act indicator on the Primary unit should also be a steady green, while the Com Act indicator on the Standby RIO head should be blinking slowly

Illustrations of the Primary and Standby Backplanes are shown below.

Primary

140

 

 

 

Backplane

 

 

 

 

CHS 110 00

RIO Head

 

HOT STANDBY

HOT STANDBY

 

Active

Active

 

Ready

Fault

Ready

Fault

 

Run

Bal Low

Run

Bal Low

 

Pwr ok

 

Pwr ok

 

 

Modbus Com Err

Modbus Com Err

 

Modbus! Error A

Modbus! Error A

 

Com Act Error B

Com Act Error B

 

Primary

 

Primary

 

 

Mem Prt Standby

Mem Prt Standby

Standby

140

 

 

 

Backplane

 

 

 

 

CHS 110 00

RIO Head

 

HOT STANDBY

HOT STANDBY

 

Active

Active

 

Ready

Fault

Ready

Fault

 

Run

Bal Low

Run

Bal Low

 

Pwr ok

 

Pwr ok

 

 

Modbus Com Err

Modbus Com Err

 

Modbus! Error A

Modbus! Error A

 

Com Act Error B

Com Act Error B

 

Primary

 

Primary

 

 

Mem Prt Standby

Mem Prt Standby

840 USE 106 00 January 2003

139

Page 139
Image 139
Schneider Electric 840 USE 106 0 manual 140, CHS 110 RIO Head