Using a Quantum IEC Hot Standby System

7.5Operation

Starting Your Hot Standby System

Preconditions

Note: Start one controller at a time.

Be sure

the controller you are starting first has been fully programmed;

lthe function keyswitch on the CHS 110 module is in the Run position;

the designation slide switches on CHS 110 modules are in opposite positions.

Starting the

The first controller to power up, automatically becomes the Primary controller,

 

System

regardless of its designation as A or B.

 

 

 

 

 

 

Step

Action

 

 

 

 

 

 

1

Turn on power to the first backplane.

 

 

 

 

 

 

2

Start the controller in that backplane.

 

 

 

 

 

 

3

Turn on power to the second backplane.

 

 

 

 

 

 

4

Transfer the program from the Primary to the Standby controller by putting the

 

 

 

keyswitch in transfer position and pressing the update push button on the

 

 

 

Standby’s CHS module (refer to Using a Quantum 984 HSBY System, p. 67).

 

 

 

 

 

 

 

 

 

138

840 USE 106 00 January 2003

Page 138
Image 138
Schneider Electric 840 USE 106 0 manual 5Operation, Preconditions, Starting, Regardless of its designation as a or B