PowerLogic™ PM5100 series user guide

Chapter 3—Hardware Reference

Mounting the PM5100

The meter is designed to be mounted inside a 1/4-DIN panel cutout.

1.Inspect the gasket (installed around the perimeter of the front display) and make sure it is secured properly and not damaged.

2. Insert the meter through the mounting hole.

+0.8

-

0.0

92.0

mm

 

8 . +0

0

mm

.

 

0

 

-0 . 92

3.Line up the tabs of the retainer clips with the slots on either side of the meter. While holding the retainers at a slight angle, push the retainers in and forward to position them in place. In situations where the spacing between meters is tight, use a flat-head screwdriver with a long, narrow shaft to help secure the clips.

4.Push the middle of the clip assembly to lock the retainer in place and secure the meter.

K

CLIC

CLICK

18

© 2014 Schneider Electric All Rights Reserved

Page 18
Image 18
Schneider Electric manual Mounting the PM5100